Constructability of Top – Down Construction Methods

Constructability of Top – Down Construction Methods
Constructability of Top – Down Construction Methods

Presented By: Eamonn Connolly, James McHugh Construction Co.

Description: The rapid project completion of the huge new McDonald’s Global Headquarters in Chicago required innovation and collaboration with all team partners. This 9-story, 770,000 sf office structure was constructed using a “top-down” construction method to accelerate the project schedule and completed construction in just 18 months. This presentation will give a project overview of the numerous engineering design and construction challenges and solutions including deep foundations, secant pile ERS, top down construction, reinforced concrete flat slab, fast cycle construction, construction engineering & logistics.

Details

Title Constructability of Top – Down Construction Methods
Duration 32 Mins
Language English
Format MP4
Size 121 MB
Download Method Direct Download  
Download Links  BECOME A MEMBER VIEW DOWNLOAD LINKS

The post Constructability of Top – Down Construction Methods appeared first on Civil Engineering Knowledge Base.



source https://www.civilax.com/constructability-of-top-down-construction-methods/