Vendor-neutral data centre and interconnection services provider Teraco Data Environments has completed the JB3 data centre facility, located within the Isando campus, in Ekurhuleni. JB3 comprises 45 000 m2 of building structure, 12 000 m2 of data hall space and 29 MW of critical power load, which when combined with the existing Isando campus, totals a critical power load of 40 MW, and room for further growth.
from Engineering News | Home https://ift.tt/3y3FPoV