Rand Water on November 17 successfully completed the installation of the two valve rigs on the B11/B19 pipeline. The B11 raw water pipeline is now back in commission supplying water to the Vereeniging Water Treatment Works (WTW), which was restored to fully supply Rand Water’s Eikenhof pump station, which is supplying some municipal customers.
from Engineering News | Home https://ift.tt/3cp3WpB