Government has confirmed that the procurement allocation for Bid Window Six (BW6) of the Renewable Energy Independent Power Producer Procurement Programme (REIPPPP) has been scaled back to 4 200 MW from the 5 200 MW announced by President Cyril Ramaphosa on July 25. The National Energy Crisis Committee announced on Sunday that the decision to proceed with a 4 200 MW request for proposals (RFP) had been decided so as to ensure that the procurement process was not delayed, given that the National Energy Regulator of South Africa (Nersa) still needed to concur with a Ministerial determination opening the way for the procurement of more solar photovoltaic (PV) capacity.
from Engineering News | Home https://ift.tt/VFNepsi