The Johannesburg Development Agency (JDA) has completed construction of the Fifth road bridge in Northwold, following damage to the infrastructure after heavy flooding in December 2020. Following the disaster, the Johannesburg Roads Agency (JRA) appointed an engineer and a contractor to design and build a temporary access road off Malibongwe drive, north of the N1, as an interim measure.
from Engineering News | Home https://ift.tt/PB8vbrz