Sanral reinstates N2 uThongati, uMvoti toll payments following flood-damage repairs

The South African National Roads Agency Limited (Sanral) says toll fees at the N2 uThongati and uMvoti toll plazas will be reinstated from February 1, following the completion of repairs to flood-damaged infrastructure on the R102 and M4 near the plazas. However, while toll collection will resume on the N2 uThongati Mainline and North Ramps and N2 uMvoti Mainline and all ramps for all vehicles, toll fees on the N2 uThongati South Ramps will remain suspended until access along the M4 uThongati River Bridge has been restored, it added in a January 11 statement.

from Engineering News | Home https://ift.tt/o5H9ytR